PSEMIC LLC Project Portfolio

District Cooling, Pipeline & MEP Projects Across the UAE

Real project delivery across district cooling plants, chilled-water networks and energy transfer stations, covering heavy mechanical installation, pipeline modification, specialist interventions, instrumentation, GRP works and associated civil activities. For new pipeline packages, explore our pipeline supply & installation contracting services.

23+ Selected Project Records
2018–2026 Portfolio Period
UAE Project Coverage
Multi-Discipline Execution Capability

Specialist District Cooling & Pipeline Projects

Selected recent works supported by real PSEMIC project photographs from district-cooling plants, ETS rooms and chilled-water network interventions. For complete new-build or modification packages, see our pipeline supply and installation services.

DN500 chilled water butterfly valve replacement using pipe freezing at Danat Abu DhabiDN500 chilled water valve replacement mechanical works at Danat Abu DhabiLarge bore DN500 chilled water valve replacement project by PSEMIC Abu DhabiExcavation and shoring for DN500 chilled water valve replacement in Abu DhabiDewatering works for underground DN500 chilled water valve replacement project
Completed 2025

DN500 Valve Replacement by Pipe Freezing

Replacement of two defective DN500 butterfly valves on chilled-water supply and return lines using controlled pipe-freezing isolation, including excavation, shoring, dewatering, mechanical replacement, testing and reinstatement activities.

  • Location: Danat Development, Abu Dhabi
  • Client: PAL Danat Cooling LLC
  • Scope: Pipe freezing, DN500 valve replacement, excavation and dewatering
Completed electromagnetic chilled water flow meter installation in energy transfer station Abu DhabiPipeline preparation for electromagnetic chilled water flow meter installation in ETS room Abu Dhabi
Completed 2025

ETS Flow Meter Installation

Installation of chilled-water flow meters at multiple energy transfer stations, including pipeline preparation, flange modification, positioning, alignment and final mechanical connection.

  • Locations: Multiple ETS facilities, Abu Dhabi
  • Scope: Flow meter mechanical installation
Completed thermowell and temperature instrument installation on chilled water piping in Abu DhabiWelded thermowell connection preparation on chilled water pipeline in ETS room Abu Dhabi
Completed 2025

ETS Thermowell Installation

Installation of thermowells and associated temperature-monitoring connections on chilled-water piping, including local insulation and cladding access, welding and reinstatement works.

  • Sector: District Cooling / ETS
  • Scope: Thermowell and temperature instrument connections
Chilled water hot tapping branch connection on operating pipeline in Abu DhabiHot tapping intervention and cutter for live chilled water pipeline modification
Completed 2024

CHW Hot Tapping Works

Controlled hot tapping of an operating chilled-water pipeline to create a branch connection without requiring complete network shutdown.

  • Location: Plot RT3-C13
  • Scope: Live-system chilled-water pipeline intervention
HVAC and chilled water line relocation at Danat district cooling plant Abu Dhabi
Completed 2025

HVAC Line Relocation

Planned relocation and modification of HVAC piping within the district-cooling plant, including shutdown coordination, piping modification, connection and reinstatement works.

  • Location: Danat District Cooling Plant
  • Client: PAL Cooling
  • Scope: HVAC piping relocation and modification
District cooling chilled water pipeline leakage rectification at DCP Saraya Abu Dhabi
Completed 2025

Pipeline Leakage Rectification

Specialist pipeline leakage rectification at an operating district-cooling facility, including access preparation, localized repair and restoration of the affected pipeline area.

  • Location: DCP Saraya, Abu Dhabi
  • Client: PAL Cooling
  • Scope: Pipeline leakage repair
Cooling tower basin GRP lamination and repair works by PSEMIC Abu DhabiCooling tower basin GRP repair lamination and protective finishing
Completed 2025

Cooling-Tower Basin GRP Repairs

GRP lamination, localized repair and protective finishing of existing cooling-tower basin areas as part of planned district-cooling plant maintenance works.

  • Sector: District Cooling
  • Scope: GRP repair, lamination and protective finishing
GRP vortex breaker fabricated for cooling tower district cooling applicationInstalled GRP vortex breaker for cooling tower hydraulic performance improvement
Completed 2025

GRP Vortex Breakers for Cooling Towers

Supply and installation of GRP vortex breakers to support cooling-tower hydraulic performance and district-cooling plant enhancement activities.

  • Sector: District Cooling
  • Scope: GRP fabrication and installation

Need a Contractor for a New Pipeline Package?

The projects shown above demonstrate PSEMIC's real site capability. For new works, we can undertake complete supply-and-install or installation-only packages for pre-insulated CHW, carbon steel, HDPE, uPVC, PVC and PVDF piping systems.

Material procurement and project-specific fabrication
Welding, HDPE fusion and approved thermoplastic jointing
Installation, supports, valves and equipment connections
Field-joint insulation, testing, commissioning and handover

Historical Project Portfolio

Selected completed projects demonstrating PSEMIC's experience in district cooling, chilled-water networks, pipeline installation and electromechanical works.

2021

Completed 2021

CHW Pipeline and Plate Heat Exchangers at New Shams DCP

Installation of pipeline and accessories serving six plate heat exchangers for district-cooling operations.

  • Location: Reem Island, Abu Dhabi
  • Client: PAL Shams Cooling LLC
Completed 2021

Shutdown Works for Danat DCP and Shams Extension

Pipeline installation works associated with chillers during planned shutdown and plant extension activities.

  • Location: Abu Dhabi
  • Client: PAL Cooling Holding LLC
Completed 2021

Bag Filters at Tamouh District Cooling Plant

Pipeline and accessory installation for bag-filter systems supporting district-cooling plant filtration.

  • Location: Reem Island, Abu Dhabi
  • Client: PAL First Cooling LLC
Completed 2021

CHW Headers and Related Works

Welding, fabrication, insulation and commissioning activities for chilled-water headers and associated district-cooling infrastructure.

  • Location: Reem Mall, Abu Dhabi
  • Client: PAL Cooling Holding LLC

2020

Completed 2020

Stainless-Steel Spool Welding

Welding and fabrication of heat-exchanger and pump headers and connections for a hospitality facility.

  • Location: Atlantis Hotel, Dubai
  • Scope: Stainless-steel fabrication and welding
Completed 2020

Chilled-Water Pipeline Mechanical Works

Installation, testing, flushing and commissioning support for a chilled-water pipeline system.

  • Location: Barmid Island, Abu Dhabi
  • Client: PAL Cooling Holding
Completed 2020

Four Heat Exchangers with Piping and Testing

Installation of four heat exchangers with associated piping, testing and commissioning services.

  • Location: Abu Dhabi
  • Client: Construction Contracting House LTD
Completed 2019–2020

CHW Pipeline Building Connections

Supply and installation of chilled-water pipeline building connections serving Park Heights developments.

  • Location: Dubai Hills
  • Client: Emaar

2019

Completed 2019

CHW Pipeline Network Installation

Underground chilled-water pipeline network installation with insulation and testing support.

  • Location: Atlantis, Dubai
  • Client: Empower
Completed 2019

Chillers, Pumps and AHUs Installation

Installation of two chillers, six pumps and 28 air-handling units, including testing and commissioning.

  • Location: KEZAD, Abu Dhabi
  • Client: SFC
Completed 2019

CHW Network Piping and Fittings

Welding and fabrication of chilled-water network piping and fittings.

  • Location: Abu Dhabi
  • Client: EPPI
Completed 2019

Five-Star Building Mechanical Piping Works

Installation and commissioning of piping serving 520 FCUs, eight AHUs, eight FAHUs, five chillers and nine pumps.

  • Location: Dubai
  • Scope: HVAC and chilled-water mechanical works

2018–2019

Completed 2018–2019

CHW Network Piping Fabrication

Welding and fabrication services for chilled-water network piping.

  • Location: Abu Dhabi
  • Client: Emirates Pre-insulated Pipes Industries
Completed 2018

Underground CHW Network at Deira Waterfront

Installation, testing and commissioning of an underground chilled-water network.

  • Location: Deira Waterfront, Dubai
  • Scope: CHW pipeline installation
Completed 2018

CHW Networks at DLRC, Dubiotech, DHCC and IMPZ

Welding and fabrication works across multiple chilled-water network developments.

  • Location: Dubai
  • Client: Empower
Completed 2018

Dubai Hills District Cooling CHW Network

Welding and fabrication works for the chilled-water network serving Dubai Hills District Cooling.

  • Location: Dubai Hills
  • Client: Empower

This page presents selected completed project records and representative real project photographs. Detailed commercial, operational and technical information remains subject to applicable client and project confidentiality requirements.

Following UAE district-cooling development? Explore our overview of new district cooling projects & plants in the UAE, including announced plants, network expansion and infrastructure opportunities relevant to the sector.

Planning a Similar Project?

Share your project location, system details, required scope and target schedule. PSEMIC can review the requirement and advise the suitable execution approach.

Scroll to Top