PSEMIC LLC Project Portfolio
District Cooling, Pipeline & MEP Projects Across the UAE
Real project delivery across district cooling plants, chilled-water
networks and energy transfer stations, covering heavy mechanical
installation, pipeline modification, specialist interventions,
instrumentation, GRP works and associated civil activities. For new
pipeline packages, explore our pipeline supply & installation contracting services.
23+
Selected Project Records
2018–2026
Portfolio Period
UAE
Project Coverage
Multi-Discipline
Execution Capability
Featured Real Project
DCP Expansion – Heavy-Duty Pump Rigging & Large-Diameter CHW Pipeline Installation
District-cooling plant expansion works involving heavy-duty
pump installation, suction diffusers, large-diameter chilled-water
piping, chemical anchoring, non-shrink grouting, structural
pipe supports and associated mechanical and civil works. Similar
pipeline packages can be delivered under our
complete pipeline contracting scope.
Client: PAL Cooling
Sector: District Cooling
Location: Abu Dhabi, UAE
Status: Completed
Major Scope Executed
Integrated Mechanical, Rigging & Pipeline Works
- Heavy-duty pump rigging and installation
- Pump positioning and leveling
- Chemical anchoring
- Non-shrink grouting
- Suction diffuser installation
- Large-diameter CHW piping
- Pipeline spool-piece connections
- Heavy-duty structural supports
- Fabricated pipe saddles
- RCC support foundations
- Anchor-bolt arrangements
- Rigging and temporary support works
Project Capability
Heavy Mechanical Installation
The project demonstrates PSEMIC's capability to coordinate
heavy equipment installation, mechanical piping,
structural fabrication and associated civil support
works within an operational district-cooling environment.
Pump Rigging
Suction Diffusers
CHW Piping
Chemical Anchoring
Grouting
Pipe Supports
RCC Foundations
Mechanical Installation
Swipe on tablet or mobile, or use the arrows to review selected real project photographs covering heavy equipment installation, suction diffusers, large-diameter CHW piping, structural supports and associated civil works.
Recent Project Delivery
Specialist District Cooling & Pipeline Projects
Selected recent works supported by real PSEMIC project photographs
from district-cooling plants, ETS rooms and chilled-water network interventions.
For complete new-build or modification packages, see our
pipeline supply and installation services.
Completed
2025
Replacement of two defective DN500 butterfly valves on chilled-water
supply and return lines using controlled pipe-freezing isolation,
including excavation, shoring, dewatering, mechanical replacement,
testing and reinstatement activities.
Completed
2025
Installation of chilled-water flow meters at multiple energy transfer
stations, including pipeline preparation, flange modification,
positioning, alignment and final mechanical connection.
Completed
2025
Installation of thermowells and associated temperature-monitoring
connections on chilled-water piping, including local insulation
and cladding access, welding and reinstatement works.
Completed
2024
Controlled hot tapping of an operating chilled-water pipeline
to create a branch connection without requiring complete
network shutdown.
Completed
2025
HVAC Line Relocation
Planned relocation and modification of HVAC piping within
the district-cooling plant, including shutdown coordination,
piping modification, connection and reinstatement works.
Completed
2025
Specialist pipeline leakage rectification at an operating
district-cooling facility, including access preparation,
localized repair and restoration of the affected pipeline area.
Completed
2025
Cooling-Tower Basin GRP Repairs
GRP lamination, localized repair and protective finishing
of existing cooling-tower basin areas as part of planned
district-cooling plant maintenance works.
Completed
2025
GRP Vortex Breakers for Cooling Towers
Supply and installation of GRP vortex breakers to support
cooling-tower hydraulic performance and district-cooling
plant enhancement activities.
From Project Experience to New Execution
Need a Contractor for a New Pipeline Package?
The projects shown above demonstrate PSEMIC's real site capability.
For new works, we can undertake complete supply-and-install or installation-only
packages for pre-insulated CHW, carbon steel, HDPE, uPVC, PVC and PVDF piping systems.
Material procurement and project-specific fabrication
Welding, HDPE fusion and approved thermoplastic jointing
Installation, supports, valves and equipment connections
Field-joint insulation, testing, commissioning and handover
Established Track Record
Historical Project Portfolio
Selected completed projects demonstrating PSEMIC's
experience in district cooling, chilled-water networks,
pipeline installation and electromechanical works.
2021
Completed
2021
CHW Pipeline and Plate Heat Exchangers at New Shams DCP
Installation of pipeline and accessories serving six plate heat exchangers for district-cooling operations.
Completed
2021
Shutdown Works for Danat DCP and Shams Extension
Pipeline installation works associated with chillers during planned shutdown and plant extension activities.
Completed
2021
Bag Filters at Tamouh District Cooling Plant
Pipeline and accessory installation for bag-filter systems supporting district-cooling plant filtration.
Completed
2021
CHW Headers and Related Works
Welding, fabrication, insulation and commissioning activities for chilled-water headers and associated district-cooling infrastructure.
2020
Completed
2020
Stainless-Steel Spool Welding
Welding and fabrication of heat-exchanger and pump headers and connections for a hospitality facility.
Completed
2020
Chilled-Water Pipeline Mechanical Works
Installation, testing, flushing and commissioning support for a chilled-water pipeline system.
Completed
2020
Four Heat Exchangers with Piping and Testing
Installation of four heat exchangers with associated piping, testing and commissioning services.
Completed
2019–2020
CHW Pipeline Building Connections
Supply and installation of chilled-water pipeline building connections serving Park Heights developments.
2019
Completed
2019
CHW Pipeline Network Installation
Underground chilled-water pipeline network installation with insulation and testing support.
Completed
2019
Chillers, Pumps and AHUs Installation
Installation of two chillers, six pumps and 28 air-handling units, including testing and commissioning.
Completed
2019
CHW Network Piping and Fittings
Welding and fabrication of chilled-water network piping and fittings.
Completed
2019
Five-Star Building Mechanical Piping Works
Installation and commissioning of piping serving 520 FCUs, eight AHUs, eight FAHUs, five chillers and nine pumps.
2018–2019
Completed
2018–2019
CHW Network Piping Fabrication
Welding and fabrication services for chilled-water network piping.
Completed
2018
Underground CHW Network at Deira Waterfront
Installation, testing and commissioning of an underground chilled-water network.
Completed
2018
CHW Networks at DLRC, Dubiotech, DHCC and IMPZ
Welding and fabrication works across multiple chilled-water network developments.
Completed
2018
Dubai Hills District Cooling CHW Network
Welding and fabrication works for the chilled-water network serving Dubai Hills District Cooling.
This page presents selected completed project records and representative
real project photographs. Detailed commercial, operational and technical
information remains subject to applicable client and project confidentiality requirements.
Planning a Similar Project?
Share your project location, system details, required scope
and target schedule. PSEMIC can review the requirement
and advise the suitable execution approach.