ETS Room, Heat Exchanger & Pump Installation Abu Dhabi

PSEMIC undertakes mechanical installation, modification and maintenance works for energy transfer stations, plate heat exchangers, pumps, valves, headers and associated chilled-water piping.

Our scope can include equipment positioning, alignment, piping connections, supports, instrumentation interfaces, testing, flushing and commissioning support.

ETS RoomsMechanical execution
PHEXInstallation & connection
PumpsAlignment & piping
CHWTesting & commissioning
Integrated ETS Mechanical Works

From Equipment Placement to Connected & Tested ETS Systems

Energy transfer stations combine heat exchangers, pumps, valves, strainers, instrumentation and chilled-water piping in a compact mechanical system.

PSEMIC can support both new ETS installations and modification/maintenance works, coordinating equipment placement, piping, supports, tie-ins, testing and final completion activities.

ETS Room, Heat Exchanger & Pump Installation Abu Dhabi project work by PSEMIC in Abu Dhabi
Service Scope

ETS, Heat Exchanger & Pump Installation Scope

Project execution can be tailored around client-supplied equipment or a broader supply-and-install package.

01

Plate Heat Exchanger Installation

Positioning, alignment, connection, valves, supports and associated piping works for PHEX systems.

02

Pump Installation & Alignment

Pump positioning, base checks, alignment support, suction/discharge piping and accessory connections.

03

CHW Headers & Piping

Fabrication and installation of chilled-water headers, branches, valves and equipment connections.

04

Flow Meters & Thermowells

Mechanical preparation and installation support for flow measurement and temperature instrument connections.

05

Valve & Accessory Installation

Strainers, isolation valves, flexible connectors, gauges and project-specific mechanical accessories.

06

Testing & Commissioning

Pressure testing, flushing, inspection and coordinated commissioning support for completed ETS works.

Mechanical Integration Beyond Equipment Placement by PSEMIC in Abu Dhabi
Complete ETS Execution

Mechanical Integration Beyond Equipment Placement

Good ETS execution depends on alignment between equipment, piping, valves, supports and instrumentation.

PSEMIC can coordinate the mechanical interfaces so the installed system is practical to operate, inspect and maintain.

Equipment positioning and alignment
Piping fabrication and connection
Valve and instrumentation interfaces
Supports and access considerations
Testing, flushing and commissioning
Typical Applications

Typical ETS & Mechanical Applications

Energy Transfer Stations
District Cooling Buildings
Plate Heat Exchangers
CHW Pumps
Mechanical Rooms
Flow Meter Installation
Thermowell Installation
System Modifications
Frequently Asked Questions

ETS Room, Heat Exchanger & Pump Installation FAQ

Can PSEMIC install client-supplied plate heat exchangers and pumps?

Yes. Installation-only scopes can be executed using approved client-supplied equipment and materials.

Can piping and valves be included?

Yes. Associated CHW piping, headers, valves, supports and equipment connections can form part of the installation scope.

Do you support flow meter and thermowell installation?

Yes. Mechanical preparation and installation support for flow meters, thermowells and related connections can be included.

Can testing and commissioning be included?

Yes. Pressure testing, flushing, inspection and commissioning support can be included depending on the project requirements.

Planning an ETS or PHEX Installation?

Send Equipment Data, Drawings & Site Details

For quotation, send equipment details, drawings, pipe sizes, valve requirements, site location and required testing/commissioning scope.