PSEMIC LLC • Abu Dhabi, UAE

District Cooling Plant & Energy Transfer Station Works

Construction, installation, modification, testing and maintenance support for district-cooling plants and Energy Transfer Stations, including chilled-water piping, pumps, plate heat exchangers, valves, headers and associated electromechanical systems.

Since 2014 Supporting UAE infrastructure
Abu Dhabi Project and maintenance support
Plant + ETS Integrated mechanical capability
ISO Systems Quality, environment and OH&S
Integrated capability

District-cooling and ETS services

PSEMIC supports new installations, system modifications, planned shutdowns and maintenance activities through coordinated mechanical, piping, testing and commissioning services.

01

District Cooling Plant Works

Installation, modification and maintenance of chilled-water equipment, headers, valves, pumps and associated mechanical systems within district-cooling facilities.

02

Energy Transfer Stations

ETS-room installation and maintenance covering plate heat exchangers, circulation pumps, control valves, meters, strainers, headers and connecting pipework.

03

Chilled-Water Piping

Fabrication, installation and modification of carbon-steel, HDPE and GRP piping, including fittings, flanges, supports, valves and connection works.

04

Pumps & Heat Exchangers

Equipment positioning, installation, alignment, connection, inspection and maintenance support for pumps and plate heat exchangers.

05

Valve & Pipeline Intervention

Valve replacement, pipe freezing, hot tapping and line stopping for controlled pipeline modifications and reduced shutdown requirements where technically suitable.

06

Testing & Commissioning

Pressure testing, flushing, cleaning, system checks, reinstatement and commissioning support in accordance with approved project requirements.

Energy Transfer Station equipment and chilled-water piping
Plant and ETS equipment

Coordinated installation from equipment to commissioning

Our scope can be coordinated around approved drawings, method statements, permits and shutdown programmes to support safe and orderly execution.

Project execution

A controlled delivery process

Final execution is developed around the approved scope, site conditions, client procedures and applicable safety and quality requirements.

1. Site Review

Review access, existing services, drawings, interfaces, shutdown requirements and work constraints.

2. Planning

Prepare method statements, risk assessments, permits, material requirements and execution sequencing.

3. Installation

Complete equipment, piping, supports, valves, insulation and associated mechanical works.

4. Testing

Perform required inspections, pressure testing, flushing, reinstatement and commissioning support.

Frequently asked questions

District cooling and ETS FAQs

What does ETS mean in district cooling?

ETS means Energy Transfer Station. It transfers cooling energy from the district chilled-water network to the building system, typically through plate heat exchangers, pumps, control valves, meters and associated piping.

Can PSEMIC support modifications to an operating chilled-water system?

Yes. Subject to engineering review and site suitability, PSEMIC can support planned shutdowns, valve replacement, pipe freezing, hot tapping, line stopping and controlled pipeline modifications.

Do you provide testing and commissioning support?

Yes. Our work may include pressure testing, flushing, cleaning, mechanical checks, system reinstatement and commissioning support according to the approved project requirements.

Which locations do you serve?

PSEMIC supports projects throughout Abu Dhabi and other UAE locations, subject to the project scope, schedule and site requirements.

Discuss your requirement

Planning district-cooling or ETS work?

Send us your scope, drawings, bill of quantities or site requirements for technical review and quotation.

Scroll to Top