Flow Meter & Thermowell Installation Abu Dhabi
PSEMIC provides mechanical installation support for flow meters, thermowells and associated chilled-water instrumentation connections in Abu Dhabi.
Scope can include pipe modification, spool fabrication, flanges, fittings, weldolets/threadolets, supports, isolation arrangements and testing.
Correct Pipework Preparation for Instrument Accuracy & Access
Flow meters and thermowells require the correct mechanical connection, orientation, access and pipework preparation in accordance with approved drawings and manufacturer requirements.
PSEMIC can execute the mechanical works around the instrument while instrumentation wiring, calibration and control-system integration remain subject to the agreed project scope.

Typical Flow Meter & Thermowell Scope
Work can be completed as part of a new ETS installation, plant modification or planned shutdown.
Pipe Modification
Cutting, spool modification and required straight-length preparation where specified.
Flange / Fitting Installation
Flanges, reducers, weldolets, threadolets and instrument connections.
Flow Meter Installation
Mechanical installation of approved inline flow-meter assemblies.
Thermowell Installation
Mechanical preparation and installation of thermowell connections.
Supports & Accessibility
Supports and arrangement adjustments for safe maintenance access.
Testing & Reinstatement
Pressure/leak testing and reinstatement after completion.
Typical Installation Sequence
Connected Mechanical & District Cooling Capabilities
ETS, Heat Exchanger & Pump Installation
Flow measurement as part of complete ETS-room mechanical works.
View ETS Services →Pipeline Contracting
Pipe modifications, spool fabrication and welded connections.
View Pipeline Services →Emergency Welding & Fabrication
Welded instrument connections and on-site fabrication support.
View Welding Services →Flow Meter & Thermowell Installation Abu Dhabi FAQ
Does PSEMIC supply flow meters?
Supply can be reviewed by project; installation-only scopes using approved client-supplied instruments are also possible.
Do you handle electrical wiring and calibration?
Mechanical installation is the primary scope. Electrical/control wiring and calibration should be confirmed separately if required.
Can installation be carried out during a shutdown?
Yes. Pipe modification and instrument installation can be planned within approved shutdown windows.
Planning a Flow Meter or Thermowell Installation?
Send instrument data sheets, pipe size, drawings, connection details and shutdown requirements.