PHEX • ETS Rooms • CHW Connections

Plate Heat Exchanger Installation Abu Dhabi

PSEMIC provides plate heat exchanger installation, replacement and mechanical connection support for ETS rooms and chilled-water systems across Abu Dhabi.

Our scope can include positioning, alignment, primary and secondary CHW connections, valves, instruments, supports, testing and commissioning support.

PHEXInstall & replace
ETS RoomsMechanical integration
CHW ConnectionsPrimary & secondary
TestingPressure & commissioning
Plate Heat Exchanger Installation

Integrating the PHEX Into the Complete ETS System

A plate heat exchanger must be installed with the correct orientation, service clearances and piping arrangement so it remains practical to operate and maintain.

Mechanical integration typically includes valves, strainers, gauges, flow measurement, thermowells, drains, vents and associated chilled-water connections.

Plate Heat Exchanger Installation Abu Dhabi work by PSEMIC in Abu Dhabi
Service Scope

Typical PHEX Installation Scope

Installation can be executed as a standalone equipment package or part of a complete ETS-room scope.

01

Positioning & Alignment

Equipment positioning and interface checks before final connection.

02

Primary CHW Connections

District-cooling side piping, valves, strainers and accessories.

03

Secondary CHW Connections

Building-side piping and required equipment connections.

04

Instrumentation Interfaces

Flow meter, thermowell, gauge and sensor connection support.

05

Supports & Accessories

Pipe supports, fabricated accessories, drains and vents.

06

Testing & Commissioning

Pressure testing, flushing and coordinated commissioning support.

Execution Sequence

Typical PHEX Installation Sequence

01. ReviewCheck drawings, nozzle orientation and service clearances.
02. PositionSet and align the heat exchanger.
03. ConnectComplete primary and secondary piping.
04. InstrumentInstall required flow and temperature interfaces.
05. TestPressure test, flush and commission.
Frequently Asked Questions

Plate Heat Exchanger Installation Abu Dhabi FAQ

Can PSEMIC install client-supplied PHEX units?

Yes. Installation-only packages can be executed using approved client-supplied equipment.

Can valves and piping be included?

Yes. Primary/secondary CHW piping, valves, strainers, supports and accessories can form part of the scope.

Can instruments be installed with the PHEX?

Yes. Mechanical installation support for flow meters, thermowells and gauges can be included.

Project Enquiry

Need PHEX or ETS-Room Installation Support?

Send the PHEX data sheet, GA drawing, nozzle sizes, piping drawings and required testing/commissioning scope.

Send Project Details